- Well Intervention
- Products
- Services
- Solutions
- Engineering
- Industry Applications
- About
- Resources
- Contact
The Pump Out Sub is used to circulate fluid from the drill string after the drill stem test has been completed, and the drill string is ready to be removed.
The tool consists of a short sub with one or more hollow pins screwed into the sides. These pins project into the sub bore during the course of a test. The tool can be configured with two shear pins, two rupture disks or one shear pin and one rupture disk, and as a Radioactive Marker Sub (RA Sub).
Copyright © 2023- All Rights Reserved
Please fill out the form below and we will get back to you as soon as possible.
Please fill out the form below and we will get back to you as soon as possible with more information regarding this tool.